|
FH 4,5 filler heater with hot filler silo integrated in a normal asphalt plant for mastic asphalt production. Performance approx. 4,5 to/hour hot filler 180°C |
Front view mastic asphalt production plant with 4 hoppers, weighing belt, feeding belt, distribution pipe, bitumen tank and full automatic micro processor control system |
|
Front view mastic asphalt production plant with 4 hoppers, weighing belt, feeding belt, distribution pipe, bitumen tank and full automatic micro processor control system |
Control system |
|
Bitumentank 40m³ electrically heated |
Filler heater, 6 to per batch |