Products - Vertical mastic asphalt mixers
For a detailed view please click on photo

Changeable lifting frames with gussasphalt mixer and joint material mixer or tool and machinery container.

Changeable lifting frame with asphalt concrete thermo container

Changeable lifting frames with gussasphalt mixer and joint material mixer or tool and machinery container.

Changeable lifting frame with asphalt concrete thermo container

GTK 26 S Duo on semitrailer for 3-axle pullingtruck capacity up to 28 to (height only 3,4 m)

GTK 15 S with tipping device

GTK 26 S Duo on semitrailer for 3-axle pullingtruck capacity up to 28 to (height only 3,4 m)

GTK 15 S with tipping device

GTK-02A 12 S mounted on turn table trailer with aluminium mudguards

GTK 15 S

GTK-02A 12 S mounted on turn table trailer with aluminium mudguards

GTK 15 S

GTKZ 12 S air suspension, disc brake, oilheating

GTK 14 S on lifting frame

GTKZ 12 S air suspension, disc brake, oilheating

GTK 14 S on lifting frame

GTK 14 S with GTKZ 13 S oil heating

GTK 15 S with heated gas bottle box

GTK 14 S with GTKZ 13 S oil heating

GTK 15 S with heated gas bottle box

GTK 15 S with Atlas hook rolling system

GTK 4 S auf Renault LKW

GTK 15 S with Atlas hook rolling system

GTK 4 S on Renault truck

GTK Z 4 S, capacity 4t

GTK 8 S auf Multiliftrahmen

GTK Z 4 S, capacity 4t

GTK 8 S on multilift frame

GTK Z 4 S and wheel barrow 100l

GTK 1,0 S fittet on a 2t tandem trailer

GTK Z 4 S and wheel barrow 100l

GTK 1,0 S fittet on a 2t tandem trailer with ball coupling, empty weight 1t

GTK 1,0 ST melting boiler indirect heating propangas engine

GTK 1,2 S melting boiler

GTK 1,0 ST melting boiler indirect heating propangas engine

GTK 1,2 S melting boiler with dieselengine, e-start, autom. temperature control capacity 600 l

GTK 1,2 S melting boiler

GTK 1,5 S special mixer for glueing material and mastic asphalt with double bottom

GTK 1,2 S melting boiler with dieselengine, e-start, autom. temperature control capacity 600 l

GTK 1,5 S special mixer for glueing material and mastic asphalt with double bottom

GTK 2,0S (about 900 ltr.) special mixer with double botton indirect heating

GTK 01A 1,5 S with hopper

GTK 2,0S (about 900 ltr.) special mixer with double botton indirect heating

GTK 01A 1,5 S with hopper

GTK 01A 1,5 S with hopper

GTK 01A 1,5 S "S" heavy duty version

GTK 01A 1,5 S with hopper

GTK 01A 1,5 S "S" heavy duty version